Integrated Resource Recovery Facility - Fyshwick

The project

Hi Quality ACT Pty Ltd propose to develop an integrated resource recovery facility which will receive, store, and process approximately 1,000,000 tonnes of waste per year. The project is a multi-operational waste management hub which involves a number of waste streams including wood burning and asbestos containing material storage and transportation.

EIS process

The Environmental Impact Statement (EIS) details the anticipated environmental impacts of a development, as well as proposing avoidance and mitigation measures. An EIS is prepared by a proponent to enable decision makers to understand the environmental consequences of a proposed development. The EIS is required to address matters raised in the scoping document for the proposal. Read more about the EIS process.

A scoping document has now been issued by the planning and land authority for this project (EIS201900001) which outlines the matters to be addressed in the EIS.

Public consultation

Hi Quality ACT Pty Ltd is currently preparing a draft EIS to address each matter raised in the scoping document. In accordance with the Planning and Development Act 2007, the draft EIS will be publicly notified here for a minimum of 20 working days once lodged. The public will have an opportunity to view the proposal and make representations at that stage and the proponent is required to address comments on the draft EIS in a revised EIS.

Application and supporting documents

Scoping document application